All posts by admin

Tillamook Medical Plaza – Adventist’s Hospital – Tillamook, OR

m_tillamookmob07

Mechanical, Electrical and Plumbing design for this new medical office building, on the campus of Adventist’s Tillamook County General Hospital, which accommodates 12 providers.

m_tillamookmob04

Technology is a key feature of the facility, and future technology changes are accommodated, including informational monitors, flexibility / adaptability for computers in exam rooms, and adjustable workstations to accommodate correct ergonomic practices.

m_tillamookmob03

Curry Medical Center – Brookings, OR

m_currymedical02

Mechanical, Electrical, and Plumbing design for this new hospital, which provides this Southern Oregon region with significantly expanded healthcare services.

m_currymedical08

Includes a laboratory, infusion services, imaging, and orthopedic, pediatric, and family practice clinics.

Woodburn WellSpring Medical Center – Silverton Hospital

w_wellspring01 w_wellspring02

Mechanical, Electrical, and Plumbing design for this freestanding health and wellness center, designed for Silverton Hospital, completely transforming the shell of a defunct retail chain store.

w_wellspring04

Complementing the hospital’s customary services, it provides integrative medicine, aesthetics/dermatology/spa, NW style bistro, health retail, PT/rehabilitation, conference center, fitness center, health education, urgent care, healthy weight, and healing gardens.

w_wellspring10

Cascades of the Sierras – Spanish Springs, NV

cascades_of_the_sierra_1

Mechanical, Electrical, and Plumbing design for a new 243,000 square foot facility with independent living, assisted living, and memory care.

cascades_of_the_sierra_2

Located in a new development outside Sparks, this Continuing Care Retirement Community is situated on seven acres with 120 Congregate Care units, 96 Assisted Living units, and a Memory Care wing for 24 residents.

cascades_of_the_sierra_3

cascades_of_the_sierra_4

cascades_of_the_sierra_6

Oregon Dept of Veterans Affairs – Edward C. Allworth Veteran’s Home

47-ODVA_LEBANON_34

Mechanical, Electrical, and Plumbing design for a new 154-bed skilled nursing facility, including SEED study.

47-ODVA_LEBANON_22

Set within a 12-acre campus environment that emphasizes independence and interpersonal connections.

This park-like campus contains four “neighborhoods,” clusters of small residential buildings connected by a spine of shared program space.

A central community building contains all administration offices, as well as a bistro, a physical therapy center, a large activity room and adjacent lounge, a chapel and library, staff lounges and lockers.

47-ODVA_LEBANON_26

Marquis Las Vegas

46-MARQUIS_VEGAS_2

Mechanical, Electrical, and Plumbing design for a new two-story 55,000 square foot 120-unit skilled nursing facility.

Provides post-acute rehab and long term care services for a growing senior population.

Additionally, the facility features a 24 bed ventilation wing which includes connections for medical gas and greater level of care.

Garmin AT Addition

GarminAT-1

Mechanical, Electrical, and Plumbing design for this new facility that has offices and support spaces for up to 150 engineers and a call center for more than 200 staff.

Two-story skylit spaces in the center of the building support collaboration and fill the building with daylight.

GarminAT-3

Situated around a newly-designed sports field, the building creates a cohesive campus supportive of Garmin’s goal of providing a dynamic and innovative work environment.

The building features 100% LED interior and exterior lighting.

State-of-the-art digital lighting controls interconnected with common CAT5 data cabling were utilized for occupancy sensing, manual dimming, and automatic daylight dimming, as well as being integrated with the building’s Energy Management System for nighttime sweeps.

A 300 kW diesel generator provides code-required emergency backup as well as owner-requested standby backup.

Daimler Trucks – Saltillo Mexico LED Lighting

Saltillo-LED 02

Electrical design and specifications for upgrading the existing large truck manufacturing plant lighting from inefficient metal halide high bay fixtures to 3000 efficient and long-life LED high bay fixtures, reducing lighting energy consumption by at least 50%, as well as reducing lamp-change maintenance costs.